Our Work

Twelve years of steel across Central and South Texas. Here is a sample of the projects our crew has delivered.

Westover Hills Distribution Center
Structural Steel

Westover Hills Distribution Center

42-ton structural package for a 60,000 sq ft distribution facility. Engineering drawings through erection in 11 weeks. Wide-flange columns, open-web joists, and moment connections throughout.

San Antonio, TX42 tons
Alamo Ranch Commercial Plaza
Custom Fabrication

Alamo Ranch Commercial Plaza

Custom steel canopy structures and decorative metalwork for a mixed-use retail development. Plasma-cut panels with powder coat finish. Architectural details per the design team's spec.

San Antonio, TX18 tons
SAWS Pump Station Retrofit
Installation

SAWS Pump Station Retrofit

Emergency structural reinforcement and equipment platform installation for a municipal water utility. Mobilized in 72 hours. Worked around live operations with zero shutdowns.

Bexar County, TX8 tons
Lackland AFB Maintenance Hangar
Structural Steel

Lackland AFB Maintenance Hangar

67-ton structural steel package for a military aircraft maintenance hangar. Clear-span moment frames, crane rail support steel, and overhead bridge crane runway beams. Federal compliance documentation included.

San Antonio, TX67 tons
Pearl District Pedestrian Bridge
Custom Fabrication

Pearl District Pedestrian Bridge

Custom-fabricated pedestrian bridge with architectural steel railings and plasma-cut decorative panels. Galvanized and powder coated for outdoor exposure. Coordinated with landscape architect.

San Antonio, TX12 tons
HEB Distribution Expansion
Welding

HEB Distribution Expansion

28-ton field welding scope for a grocery distribution facility expansion. FCAW structural connections and equipment anchor plates. Night shift operations to avoid disrupting active warehouse.

New Braunfels, TX28 tons
Brooks City Base Medical Office
Structural Steel

Brooks City Base Medical Office

34-ton structural steel package for a three-story medical office building. Composite deck connections, moment frames, and stair towers. Coordinated with MEP for floor penetrations.

San Antonio, TX34 tons
Port San Antonio Industrial Platform
Installation

Port San Antonio Industrial Platform

15-ton equipment platform installation inside an operating industrial facility. Tight-access crane work, overnight shifts, and field-fit connections to existing foundations. Mobilized and completed in 9 days.

San Antonio, TX15 tons

Have a project like this?

Send us your scope. We will review it and tell you exactly how we can help.