Installation & Erection

When your steel is fabricated by one company and installed by another, the gaps between them become your problem. We eliminated that gap. The crew that builds your steel in our shop is the same crew that sends their team to erect it on-site. One company, full accountability, no finger-pointing.

What Our Crew Handles

Rigging & Crane Coordination

Our crew runs their own lifts. We calculate rigging loads, select hardware, and signal the crane operator. No third-party rigging company trying to figure out pieces they did not build.

Multi-Story Erection

Column splices, beam-to-column connections, and deck staging across multiple stories. We sequence the steel to go up floor by floor and keep the critical path moving.

Tight-Access Installs

Retrofit work inside existing buildings, equipment platforms in operating facilities, and installs where a standard crane cannot reach. We bring the right equipment for the conditions.

Field Modifications

When conditions on the ground do not match the drawings, we have certified welders on the erection crew who can make field modifications without waiting for a separate welding sub to show up.

Safety on Every Site

Steel erection is inherently high-risk work. We treat safety as a non-negotiable operating condition, not a box to check.

Daily toolbox talks before every shift
Fall protection plans for every project
Certified crane signal persons on every lift
OSHA 10 and OSHA 30 trained crew members
Written safety program reviewed annually
Zero tolerance for shortcuts on elevated steel

Our Equipment

We own our cranes, rigging hardware, and field equipment. That means we mobilize on your schedule, not a rental company's availability.

Boom trucks (owned, not rented)
Hydraulic crane capacity for mid-rise projects
Complete rigging hardware inventory — shackles, slings, spreader bars
Mobile welding rigs for field connections
Torque wrenches calibrated to spec
Fall protection systems and personal PPE for full crew

Planning an install?

The earlier we get involved, the smoother the erection goes. Let us coordinate with your team before steel hits the site.